Grant: Engage Grants Program
University of Alberta
$25,000.00
Productivity improvement for offsite construction using Lean principles
EF 2015-16
Résumé
Fortis LGS Structures Inc. provides a light-gauge steel (LGS) construction option for Edmonton's residential
and commercial market. As Fortis's factory operates for multiple projects simultaneously, the management
team has come to recognize that it is critical to develop a system to measure productivity for the factory
production, based on which Lean principles can be applied for improvement. At present, the following
challenges exist that are targeted in this research: (1) the current manufacturing process lacks a continuous
flow, which results in overproduction and delay. The current process is also hampered by deficiencies, defects,
and rework; (2) the tools and equipment are used inefficiently and many non-value added activities exist in the
process; and (3) resource levelling is not consistent throughout the process, failing to account for the different
cycle times for each station. In order to measure and improve the productivity of Fortis's production line, the
proposed research aims to address the following objectives: (1) Collect data for the current production process:
Time study will be performed in order to capture the current state of the production process. (2) Production
process improvement: Based on the developed current-state VSM of the production line, the team will focus on
proposing potential solutions to improve the process. Ultimately a future-state value stream map (VSM) is
expected to be implemented and simulated in Fortis's production. (3) ""Check-and-Action"": The proposed
research will follow a Plan-Do-Check-Action (PDCA) process.
The proposed project is expected to bring the following environmental, socio-economic, and health benefits to
Canadians: (1) Improvement of productivity and cost savings for offsite manufacturing; (2) Mitigation of
greenhouse gas (GHG) emissions and CO2 footprint associated with residential/commercial construction; (3)
Establishment of Standard Operation Procedures (SOPs), that represent ""best practice"" and are safe from an
ergonomic perspective.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
488418-2015
Name nom
Bouferguene, Ahmed
Department département
Campus Saint-Jean
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1555
Committee name en
Prairie Internal Decision Committee
Committee name fr
Comité de décision interne pour les Prairies
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
1
Application title
Productivity improvement for offsite construction using Lean principles
Keyword
NSERC
Application summary
Fortis LGS Structures Inc. provides a light-gauge steel (LGS) construction option for Edmonton's residential
and commercial market. As Fortis's factory operates for multiple projects simultaneously, the management
team has come to recognize that it is critical to develop a system to measure productivity for the factory
production, based on which Lean principles can be applied for improvement. At present, the following
challenges exist that are targeted in this research: (1) the current manufacturing process lacks a continuous
flow, which results in overproduction and delay. The current process is also hampered by deficiencies, defects,
and rework; (2) the tools and equipment are used inefficiently and many non-value added activities exist in the
process; and (3) resource levelling is not consistent throughout the process, failing to account for the different
cycle times for each station. In order to measure and improve the productivity of Fortis's production line, the
proposed research aims to address the following objectives: (1) Collect data for the current production process:
Time study will be performed in order to capture the current state of the production process. (2) Production
process improvement: Based on the developed current-state VSM of the production line, the team will focus on
proposing potential solutions to improve the process. Ultimately a future-state value stream map (VSM) is
expected to be implemented and simulated in Fortis's production. (3) ""Check-and-Action"": The proposed
research will follow a Plan-Do-Check-Action (PDCA) process.
The proposed project is expected to bring the following environmental, socio-economic, and health benefits to
Canadians: (1) Improvement of productivity and cost savings for offsite manufacturing; (2) Mitigation of
greenhouse gas (GHG) emissions and CO2 footprint associated with residential/commercial construction; (3)
Establishment of Standard Operation Procedures (SOPs), that represent ""best practice"" and are safe from an
ergonomic perspective.