Grant: Engage Grants Program
University of Alberta
$25,000.00
Production efficiency improvement and lean application for modular manufacturing
EF 2014-15
Résumé
Kent Homes is the largest home builder in Atlantic Canada, but in order to increase the productivity of theirmanufacturing process while decreasing rework during their design process; the following challenges must beovercome: (1) The current process is hampered by deficiencies, defects, and rework, which increase the costand reduce production capacity. (2) The current process utilizes low-efficiency tools and equipment, whichincreases non-value-added activities and waste. (3) The current process fails to balance the assignment ofactivities to work stations; as a result the fundamental benefits of Takt-time and lean production principlescannot be leveraged. (4) The generated 2D drawings contain conflicts; undetected clashes are passed to themanufacturing stage after the release of the production drawings, which increases time and cost due to reworkduring manufacturing. (5) Material and component ordering lists are generated manually using productiondrawings, a process that compromises accuracy.To address the general challenge of improving the manufacturing process in order to reduce time and cost,Kent Homes must reduce rework among different phases from design, to manufacturing, to on-site assembly;automate aspects of the manufacturing process; and increase quality and customer satisfaction. In order toallow Kent Homes to eliminate deficiencies from their manufacturing process as outlined above, the proposedresearch seeks to (1) analyze the current production process; (2) assess the production line through atime-study; (3) propose recommendations for efficiency improvements; (4) create a BIM platform; (5)automate the framing method; and (6) automate the material and cost estimation process.Removing waste from their process will create the opportunity for the collaborating organization to increasetheir capacity and meet market demand. This initiative will advance research into more efficient andcost-effective engineering methods that can deliver market requirements for increased construction speed,green buildings, improved quality, and rapid return of investment.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
462827-2014
Name nom
AlHussein, Mohamed
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2014
Competition year année de concours
2014
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1555
Committee name en
Prairie Internal Decision Committee
Committee name fr
Comité de décision interne pour les Prairies
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
1
Application title
Production efficiency improvement and lean application for modular manufacturing
Keyword
NSERC
Application summary
Kent Homes is the largest home builder in Atlantic Canada, but in order to increase the productivity of theirmanufacturing process while decreasing rework during their design process; the following challenges must beovercome: (1) The current process is hampered by deficiencies, defects, and rework, which increase the costand reduce production capacity. (2) The current process utilizes low-efficiency tools and equipment, whichincreases non-value-added activities and waste. (3) The current process fails to balance the assignment ofactivities to work stations; as a result the fundamental benefits of Takt-time and lean production principlescannot be leveraged. (4) The generated 2D drawings contain conflicts; undetected clashes are passed to themanufacturing stage after the release of the production drawings, which increases time and cost due to reworkduring manufacturing. (5) Material and component ordering lists are generated manually using productiondrawings, a process that compromises accuracy.To address the general challenge of improving the manufacturing process in order to reduce time and cost,Kent Homes must reduce rework among different phases from design, to manufacturing, to on-site assembly;automate aspects of the manufacturing process; and increase quality and customer satisfaction. In order toallow Kent Homes to eliminate deficiencies from their manufacturing process as outlined above, the proposedresearch seeks to (1) analyze the current production process; (2) assess the production line through atime-study; (3) propose recommendations for efficiency improvements; (4) create a BIM platform; (5)automate the framing method; and (6) automate the material and cost estimation process.Removing waste from their process will create the opportunity for the collaborating organization to increasetheir capacity and meet market demand. This initiative will advance research into more efficient andcost-effective engineering methods that can deliver market requirements for increased construction speed,green buildings, improved quality, and rapid return of investment.