Grant: Engage Grants Program
University of Western Ontario
$25,000.00
Reuse of shallow foundations for wind turbine farms
EF 2016-17
Résumé
Canada has one of the best wind resources in the world and now has the sixth highest total installed capacity in the world. Predictions suggest that Canada may have up to 20% wind penetration over the next decade. As the first generation of 'megawatt' wind farms are reaching their mid-lives, owners are considering decommissioning of wind farms. At the end of the project life, wind turbines may be refurbished or replaced with new machines, extending the project life. This allows assets to be reused, e.g. access roads, sub-stations and underground cables, etc. If the original foundations are also utilized, further significant savings can be created. For foundation reuse to be viable, the existing foundations should have sufficient capacity to carry the new loads and perform reliably over another wind turbine life cycle. As a foundation problem, the design of wind turbine foundations is unique due to the combination of loads. Besides the relatively low vertical loading due to the self-weight of the structure, they are also subjected to large horizontal and rotational loads from the wind. Recent studies of the failure loads of circular foundations suggest that traditional foundation bearing capacity analysis does not always utilize the full capacity of these types of design. The application of coupled VHM load space methods will allow new methods to be developed, potentially enabling optimization of foundation designs and effective reuse of turbine foundations. The project will provide the Wind Energy Institute of Canada with a better understanding of their wind farm assets, which will be vital for their future expansion and/or decommissioning. It also enhances the potential range of technical services they will have available to offer to the energy sector. In addition, within 3-5 years this initiative will contribute to the development and optimization of wind infrastructure and will respond to the urgent needs of the wind energy sector, to sustain high levels of investment in the industry over the next few decades.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
494690-2016
Name nom
Newson, Timothy
Department département
Civil and Environmental Engineering
Organization id
36
Institution établissement
University of Western Ontario
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2016
Competition year année de concours
2016
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
1206
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Engineering
Area of application fr
Génie
Research subject code
1002
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Geotechnical engineering (including engineering geology)
Research subject fr
Géotechnique (y compris génie géologique)
Partie
1
Nb partie
1
Application title
Reuse of shallow foundations for wind turbine farms
Keyword
NSERC
Application summary
Canada has one of the best wind resources in the world and now has the sixth highest total installed capacity in the world. Predictions suggest that Canada may have up to 20% wind penetration over the next decade. As the first generation of 'megawatt' wind farms are reaching their mid-lives, owners are considering decommissioning of wind farms. At the end of the project life, wind turbines may be refurbished or replaced with new machines, extending the project life. This allows assets to be reused, e.g. access roads, sub-stations and underground cables, etc. If the original foundations are also utilized, further significant savings can be created. For foundation reuse to be viable, the existing foundations should have sufficient capacity to carry the new loads and perform reliably over another wind turbine life cycle. As a foundation problem, the design of wind turbine foundations is unique due to the combination of loads. Besides the relatively low vertical loading due to the self-weight of the structure, they are also subjected to large horizontal and rotational loads from the wind. Recent studies of the failure loads of circular foundations suggest that traditional foundation bearing capacity analysis does not always utilize the full capacity of these types of design. The application of coupled VHM load space methods will allow new methods to be developed, potentially enabling optimization of foundation designs and effective reuse of turbine foundations. The project will provide the Wind Energy Institute of Canada with a better understanding of their wind farm assets, which will be vital for their future expansion and/or decommissioning. It also enhances the potential range of technical services they will have available to offer to the energy sector. In addition, within 3-5 years this initiative will contribute to the development and optimization of wind infrastructure and will respond to the urgent needs of the wind energy sector, to sustain high levels of investment in the industry over the next few decades.