Program directory · Canadian Nuclear Safety Commission
Nuclear Non-Proliferation Program
- Department
- Canadian Nuclear Safety Commission
- Program code
- BTJ04 (AECB)
- Core responsibility
- Nuclear Regulation
- In Departmental Plans
- 2018-19 – 2026-27 · New since an earlier plan
What it does
This program provides assurance to both the Canadian public and the international community that the development, production and use of nuclear energy and nuclear substances, prescribed equipment and prescribed information are safe and conform with the control measures and international obligations to which Canada has agreed.
Source: the department's Program Inventory, via GC InfoBase.
History and lineage
First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).
| Program | Relation | Years with data | Actual spending over those years |
|---|---|---|---|
| Nuclear Non-Proliferation Program | This program | 2018-19 – 2028-29 | $35.3M |
No earlier or later program in the same department has a similar name.
Significant changes in scope and budget
Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.
No significant changes detected.
Success criteria
The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.
Historical: targets against results
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2018-19 | ≥ 97% | 2019 | 93.5% All required reports to the IAEA were submitted. However, 29 such reports were submitted late by licensees, which in turn meant late submissions from the CNSC to the IAEA. Two additional reports were submitted late, unrelated to licensee delays. The lateness of reports did not impact the IAEA's ability to draw its safeguards conclusions for Canada. | Not met |
| 2019-20 | ≥ 97% | 2020 | 99.1% | Met |
| 2020-21 | ≥ 97% | 2021 | 100% | Met |
| 2021-22 | ≥ 97% | 2022 | 100% | Met |
| 2022-23 | ≥ 97% | 2023 | 100% | Met |
| 2023-24 | ≥ 97% | 2024 | 100% | Met |
| 2024-25 | ≥ 97% | 2025 | 100% | Met |
Current: the 2026-27 plan's targets
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2026-27 | ≥ 97% | 2027 | — | Planned |
Future goals: targets due after 2026-27
No targets with a later due date.
Spending and employees: planned against actual
Spending
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2018-19 | $6.3M | $5.1M |
| 2019-20 | $5.6M | $4.6M |
| 2020-21 | $4.9M | $3.9M |
| 2021-22 | $4.7M | $4M |
| 2022-23 | $4.2M | $5.2M |
| 2023-24 | $5.1M | $5.5M |
| 2024-25 | $6M | $7M |
| 2025-26 | $6.5M | — |
| 2026-27 | $6.7M | — |
| 2027-28 | $6.8M* | — |
| 2028-29 | $6.7M* | — |
Employees (FTEs)
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2018-19 | 35 | 31 |
| 2019-20 | 33 | 31 |
| 2020-21 | 32 | 29 |
| 2021-22 | 32 | 25 |
| 2022-23 | 29 | 30 |
| 2023-24 | 34 | 37 |
| 2024-25 | 35 | 38 |
| 2025-26 | 36 | — |
| 2026-27 | 36 | — |
| 2027-28 | 35* | — |
| 2028-29 | 35* | — |
Planned spending, plan by plan
Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans
| Plan | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 | 2026-27 | 2027-28 | 2028-29 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2018-19 plan | $6,267,181 | $6,468,632 | $6,588,551 | ||||||||
| 2019-20 plan | $5,649,072 | $5,717,254 | $5,798,687 | ||||||||
| 2020-21 plan | $4,934,703 | $5,005,489 | $5,073,749 | ||||||||
| 2021-22 plan | $4,725,625 | $4,842,252 | $4,924,761 | ||||||||
| 2022-23 plan | $4,151,353 | $4,178,409 | $4,231,185 | ||||||||
| 2023-24 plan | $5,105,931 | $5,143,398 | $5,209,615 | ||||||||
| 2024-25 plan | $6,022,779 | $6,056,080 | $6,125,389 | ||||||||
| 2025-26 plan | $6,540,331 | $6,707,891 | $6,814,419 | ||||||||
| 2026-27 plan | $6,741,884 | $6,832,736 | $6,745,660 | ||||||||
| Actual | $5,097,722 | $4,639,213 | $3,916,108 | $4,042,894 | $5,212,645 | $5,452,110 | $6,950,362 |
Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.