Program directory · Canada Border Services Agency

Science and Engineering

Program code
BUF12 (CBSA)
Core responsibility
Border Management
In Departmental Plans
2018-19 – 2026-27 · New since an earlier plan

What it does

The Science and Engineering Program is the CBSA’s technical authority for science and engineering. This program enables the Agency to leverage science and engineering in the delivery of its mandate by providing timely, evidence-based advice to support business decisions and enforcement activities. The program’s objectives include:

• Scientific Services and Support – The scientific analysis of goods and information crossing Canadian borders, in support of revenue generation, program compliance and enforcement activities.

• Border Technology Lifecycle Management – Complete life-cycle management of detection technology, scientific instrumentation and radio communication equipment in order to meet the operational requirements of the front line for capabilities and safety.

• Applied Engineering and Disruptive Solutions – Targeted research, benchmarking and testing activities to improve the efficiency and effectiveness of border operations through the application of science, technology and engineering.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-232023-242024-252025-262026-272027-282028-29Science and Engineering 2018-19: $28.4MScience and Engineering 2019-20: $36MScience and Engineering 2020-21: $38.3MScience and Engineering 2021-22: $41.5MScience and Engineering 2022-23: $44.3MScience and Engineering 2023-24: $46.9MScience and Engineering 2024-25: $48.5MScience and Engineering 2025-26: $71.9MScience and Engineering 2026-27: $99.2MScience and Engineering 2027-28: $103MScience and Engineering 2028-29: $105MScience and EngineeringField Technology SupportScience and E…
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data. The line at the bottom shows this program's names over time.
ProgramRelationYears with dataActual spending over those years
Science and EngineeringThis program2018-19 – 2028-29$284M

No earlier or later program in the same department has a similar name.

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2019-20Spending $36M, against $28.4M in 2018-19 (+27%).Actual spending (GC InfoBase)
2023-24Indicators added: Number of analytical and forensic samples processed; Operational availability of deployed detection technology (excluding Health and Safety tools); Operational availability of Health and Safety related tools; Percentage of analytical and forensic samples analyzed within service targets; Percentage of proficiency tests that are successfulDepartmental Results Framework (GC InfoBase)
2023-24Indicators dropped: Actual analytical and forensic services provided as a percentage of all analytical and forensic services projected; Analytical and forensic services provided within time service standards as a percentage of all analytical and forensic services provided; Availability of border technology as a percentage of planned availabilityDepartmental Results Framework (GC InfoBase)
2025-26Planned spending $71.9M, against $48.5M in 2024-25 (+48%).Latest Departmental Plan
2026-27Indicators added: Percentage of border technology maintained to service standards; Percentage of reports delivered meeting service standard times; Percentage of scientific and engineering effort focused on emerging threats and solutionsDepartmental Results Framework (GC InfoBase)
2026-27Indicators dropped: Number of analytical and forensic samples processed; Operational availability of deployed detection technology (excluding Health and Safety tools); Operational availability of Health and Safety related tools; Percentage of analytical and forensic samples analyzed within service targets; Percentage of proficiency tests that are successful; Stakeholders surveyed are "satisfied" and "very satisfied" with Science and Engineering services as a percentage of all stakeholder responsesDepartmental Results Framework (GC InfoBase)
2026-27Renamed from “Field Technology Support” to “Science and Engineering”.GC InfoBase program names by year
2026-27Planned spending $99.2M, against $71.9M in 2025-26 (+38%).Latest Departmental Plan
2027-28Planned employees (FTEs) 210, against 162 in 2026-27 (+30%).FTEs (GC InfoBase)

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

Number of analytical and forensic samples processed
Expected result: Operational services and other government departments are provided with analysis, data and evidence to make accurate, technical decisions in an objective and timely manner
16,0652023-24✓ met17,5762024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2023-24≥ 16,000202416,065Met
2024-25≥ 16,000202517,576Met
Operational availability of deployed detection technology (excluding Health and Safety tools)
Expected result: Operational services leverage the available tools to make evidence-based decisions
97%2023-24✓ met91%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2023-24≥ 90%202497%Met
2024-25≥ 90%202591%Met
Operational availability of Health and Safety related tools
Expected result: Operational services leverage the available tools to make evidence-based decisions
88%2023-24✗ not met97%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2023-24≥ 90%202488%
The result was impacted by aging assets in the Large Scale Imaging Program, with multiple units out of service for prolonged periods in 2023–24. The CBSA is undertaking plans to replace aging assets going forward.
Not met
2024-25≥ 90%202597%Met
Percentage of analytical and forensic samples analyzed within service targets
Expected result: Operational services and other government departments are provided with analysis, data and evidence to make accurate, technical decisions in an objective and timely manner
86%2023-24✓ met85%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2023-24≥ 80%202486%Met
2024-25≥ 80%202585%Met
Percentage of proficiency tests that are successful
Expected result: Operational services and other government departments are provided with analysis, data and evidence to make accurate, technical decisions in an objective and timely manner
99%2023-24✓ met94%2024-25✗ not met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2023-24≥ 95%202499%Met
2024-25≥ 95%202594%
The result of 94% slightly missed the target of 95% due to inconclusive results for some tests. A review of methods was conducted and some technique improvements were identified to support the integrity of future test results.
Not met
Stakeholders surveyed are "satisfied" and "very satisfied" with Science and Engineering services as a percentage of all stakeholder responses
Expected result: Operational services leverage the available tools to make evidence-based decisions
89.1%2018-19✓ met93%2019-20✓ met91.8%2020-21✓ met93.8%2021-22✓ met90.2%2022-23✓ met95%2023-24✓ met93%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2018-19≥ 80%201989.1%Met
2019-20≥ 80%202093%Met
2020-21≥ 80%202191.8%Met
2021-22≥ 80%202293.8%Met
2022-23≥ 80%202390.2%Met
2023-24≥ 80%202495%Met
2024-25≥ 80%202593%Met
Actual analytical and forensic services provided as a percentage of all analytical and forensic services projected
Expected result: CBSA stakeholders are provided with innovative scientific and engineering services and solutions that meet their needs
96%2018-19✓ met83%2019-20✗ not met120.6%2020-21✓ met77%2021-22✗ not met91%2022-23✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2018-19≥ 90%201996%Met
2019-20≥ 90%202083%
The CBSA temporarily diverted resources for the recruitment and training of new employees, resulting in a temporary decrease in output. Also, several large multi-year cases were initiated, which further reduced output as the cases were not resolved by the end of the fiscal year.
Not met
2020-21≥ 90%2021120.6%
Despite the impact of COVID-19 restrictions on the delivery of analytical and forensic services, the CBSA was able to surpass its service projections for 2020–21.
Met
2021-22≥ 90%202277%
The CBSA’s laboratory activities were negatively impacted by distancing requirements during the COVID-19 pandemic, whereby delays in completing analytical work were caused by a reduction in the number of people permitted to access the laboratory at one time.
Not met
2022-23≥ 90%202391%Met
Analytical and forensic services provided within time service standards as a percentage of all analytical and forensic services provided
Expected result: CBSA stakeholders are provided with innovative scientific and engineering services and solutions that meet their needs
84.9%2018-19✓ met77%2019-20✗ not met71.6%2020-21✗ not met68%2021-22✗ not met89.5%2022-23✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2018-19≥ 80%201984.9%Met
2019-20≥ 80%202077%
The CBSA temporarily diverted resources for the recruitment and training of new employees, resulting in a temporary decrease in output. Also, several large multi-year cases were initiated, which further reduced output as the cases were not resolved by the end of the fiscal year.
Not met
2020-21≥ 80%202171.6%
The CBSA’s ability to provide analytical and forensic services within time service standards was impacted by COVID-19 restrictions.
Not met
2021-22≥ 80%202268%
The CBSA’s laboratory activities were negatively impacted by distancing requirements during the COVID-19 pandemic, whereby delays in completing analytical work were caused by a reduction in the number of people permitted to access the laboratory at one time.
Not met
2022-23≥ 80%202389.5%Met
Availability of border technology as a percentage of planned availability
Expected result: CBSA stakeholders are provided with innovative scientific and engineering services and solutions that meet their needs
95%2018-19✓ met91%2019-20✓ met92%2020-21✓ met93.8%2021-22✓ met92%2022-23✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2018-19≥ 90%201995%Met
2019-20≥ 90%202091%Met
2020-21≥ 90%202192%Met
2021-22≥ 90%202293.8%Met
2022-23≥ 90%202392%Met

Current: the 2026-27 plan's targets

Percentage of border technology maintained to service standards
Expected result: Border operations have the science and engineering tools and information to safely conduct examinations
95%2026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 95%2027—Planned
Percentage of reports delivered meeting service standard times
Expected result: Science and Engineering clients seek technical information to support admissibility, enforcement and revenue decisions
95%2026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 95%2027—Planned
Percentage of scientific and engineering effort focused on emerging threats and solutions
Expected result: CBSA evaluates new technological solutions and processes to solve border management evolving threats and business challenges
5%2026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 5%2027—Planned

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $44.7M2018-19: $28.4M2018-192019-20: $62.7M2019-20: $36M2019-202020-21: $47.8M2020-21: $38.3M2020-212021-22: $45.2M2021-22: $41.5M2021-222022-23: $68.9M2022-23: $44.3M2022-232023-24: $67M2023-24: $46.9M2023-242024-25: $106M2024-25: $48.5M2024-252025-26: $71.9M2025-262026-27: $99.2M2026-272027-28: $103M2027-282028-29: $105M2028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$44.7M$28.4M
2019-20$62.7M$36M
2020-21$47.8M$38.3M
2021-22$45.2M$41.5M
2022-23$68.9M$44.3M
2023-24$67M$46.9M
2024-25$106M$48.5M
2025-26$71.9M—
2026-27$99.2M—
2027-28$103M*—
2028-29$105M*—

Employees (FTEs)

2018-19: 1212018-19: 1222018-192019-20: 1202019-20: 1342019-202020-21: 1342020-21: 1212020-212021-22: 1302021-22: 1262021-222022-23: 1132022-23: 1342022-232023-24: 1852023-24: 1402023-242024-25: 2092024-25: 1312024-252025-26: 1492025-262026-27: 1622026-272027-28: 2102027-282028-29: 2112028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19121122
2019-20120134
2020-21134121
2021-22130126
2022-23113134
2023-24185140
2024-25209131
2025-26149—
2026-27162—
2027-28210*—
2028-29211*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.