Canada Spends Logo

Explore our Budget 2026 analysis

Program directory · Crown-Indigenous Relations and Northern Affairs Canada

Canadian High Arctic Research Station

Program code
BWR09 (INAC)
Core responsibility
Northern and Arctic Affairs
In Departmental Plans
2018-19 – 2023-24 · Appeared and later dropped

What it does

The Canadian High Arctic Research Station Act, which came into force on June 1, 2015, established Polar Knowledge Canada, a new federal research organization that combines the mandate and functions of the Canadian Polar Commission and the Canadian High Arctic Research Station program. The new organization is responsible for advancing Canada's knowledge of the Arctic and strengthening Canadian leadership in polar science and technology. The research facility in Cambridge Bay, Nunavut is attracting Canadian and international scientists to work on science and technology issues in Canada's North through a technology development centre, traditional knowledge centre and advanced laboratories. The station was built by Canadians to serve the world, and engage Northerners in cutting-edge science and technology. The management of the station's construction will remain with the department until it is complete.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-232023-242024-252025-26Canadian High Arctic Research Station 2018-19: $11.5MCanadian High Arctic Research Station 2019-20: $3.6MCanadian High Arctic Research Station 2020-21: $2.3MCanadian High Arctic Research Station 2021-22: $1.3MCanadian High Arctic Research Station 2022-23: $4.2MCanadian High Arctic Research Station 2023-24: $243KCanadian High Arctic Research Station 2024-25: $12KCanadian High Arctic Research Station 2025-26: $12KCanadian High Arctic Research Station
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data.
ProgramRelationYears with dataActual spending over those years
Canadian High Arctic Research StationThis program2018-19 – 2025-26$23.1M

No earlier or later program in the same department has a similar name.

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2019-20Spending $3.6M, against $11.5M in 2018-19 (−69%).Actual spending (GC InfoBase)

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

Stage of construction of the Canadian High Arctic Research Station campus
Expected result: World-class science and technology facility and labs year round
Report yearTargetDueResultStatus
2018-19Project close-out by April 20182018The Canadian High Arctic Research Station (CHARS) campus is largely operational.
In June 2018, partial substantial performance was granted and access was allowed to the Main Research Building. Components of the mechanical systems were redesigned to meet standards and were installed by the end March 2019; additional testing of these systems will take place in 2019-2020. The construction of an outdoor storage shelter was started in summer 2018 and is expected to be completed in…
Not met
2020-21Project close-out2020Target not met
The full completion of the Canadian High Arctic Research Station was moved to 2021–22 due to construction delays and COVID-19 travel restrictions. The substantial completion of the Main Research Building was granted in December 2020. The facility is operational with minor finishing work and verification to take place in 2021–22. The custodianship of the facility and land is expected to be transfe…
Not met
2021-22Project close-out2021Project close-out not complete
The construction was completed in March 2022. Additional activities to close out the project and transfer administration of the Canadian High Arctic Research Station to Polar Knowledge Canada will continue in 2022-23.
Not met
2022-23Project close-out2023Project close-out completeMet
2023-24Project close-out2024Project and construction completedMet

Current: the 2026-27 plan's targets

No indicators in the 2026-27 plan.

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $3M2018-19: $11.5M2018-192019-20: $2M2019-20: $3.6M2019-202020-21: $02020-21: $2.3M2020-212021-22: $12K2021-22: $1.3M2021-222022-23: $12K2022-23: $4.2M2022-232023-24: $12K2023-24: $243K2023-242024-25: $12K2024-252025-26: $12K2025-26
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$3M$11.5M
2019-20$2M$3.6M
2020-21$0$2.3M
2021-22$12K$1.3M
2022-23$12K$4.2M
2023-24$12K$243K
2024-25$12K*—
2025-26$12K*—

Employees (FTEs)

2018-19: 92018-19: 62018-192019-20: 02019-20: 42019-202020-21: 02020-21: 32020-212021-22: 32021-22: 42021-222022-23: 32022-23: 22022-232023-24: 22023-24: 02023-242024-25: 22024-252025-26: 22025-26
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-1996
2019-2004
2020-2103
2021-2234
2022-2332
2023-2420
2024-252*—
2025-262*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Plan2018-192019-202020-212021-222022-232023-242024-252025-26
2018-19 plan$3,000,000$0$0
2019-20 plan$2,003,328$3,328$3,328
2020-21 plan$0$0$0
2021-22 plan$12,255$12,254$12,254
2022-23 plan$12,275$12,275$12,275
2023-24 plan$12,296$12,296$12,296
Actual$11,518,354$3,611,592$2,275,557$1,330,038$4,151,618$243,311

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.