Program directory · Housing, Infrastructure and Communities Canada
Toronto Waterfront Revitalization Initiative
- Program code
- BTK10 (OICC)
- Core responsibility
- Public Infrastructure
- In Departmental Plans
- 2018-19 – 2020-21 · Appeared and later dropped
What it does
Investments through the Toronto Waterfront Revitalization Initiative will provide flood protection to southeastern portions of downtown Toronto, including parts of the port lands, South Riverdale, Leslieville, south of Eastern Avenue, and the First Gulf/Unilever development site. The Toronto Waterfront Revitalization Initiative terms and conditions are scheduled to expire in 2024. Through the Toronto Waterfront Revitalization Initiative, approximately 240 hectares of land will be protected from flooding, and approximately 73 hectares of brownfields will be remediated. Additionally, over 36 hectares of green space will be available for public use. Funding provided through the Toronto Waterfront Revitalization Initiative will also effectively upgrade municipal infrastructure in the area making improvements to roads, bridges, and water and wastewater systems. In the long-term, Toronto Waterfront Revitalization Initiative funding will provide opportunities for residential and commercial development, access to affordable housing, and public transit.
Source: the department's Program Inventory, via GC InfoBase.
History and lineage
First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).
| Program | Relation | Years with data | Actual spending over those years |
|---|---|---|---|
| Toronto Waterfront Revitalization Initiative | This program | 2018-19 – 2022-23 | $159M |
No earlier or later program in the same department has a similar name.
Significant changes in scope and budget
Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.
| Year | What changed | Source |
|---|---|---|
| 2020-21 | Indicators dropped: Number of hectares of habitat restoration; Number of hectares of land protected from flooding; Number of hectares of remediated brownfield; Number of linear metres (lm) of storm sewer added; Number of metres of new river channel added; Number of metres of protected shoreline; Number of metres of road added; Number of new bridges | Departmental Results Framework (GC InfoBase) |
| 2020-21 | Spending $60.3M, against $45.5M in 2019-20 (+33%). | Actual spending (GC InfoBase) |
| 2022-23 | Planned spending $81.3M, against $50.8M in 2021-22 (+60%). | Latest Departmental Plan |
| 2025 | Budget 2025 measure “Supporting Housing Enabling Infrastructure and Flood Protection near Toronto's Waterfront”: $0M in total over its years (linked to this program by name, a best-effort match). | Budget 2025, PDF page 279 |
Success criteria
The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.
Historical: targets against results
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2019-20 | ≥ 90% | 2020 | — Data not available | No result reported |
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2019-20 | ≥ 240 | 2020 | — Data not available | No result reported |
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2019-20 | ≥ 73 | 2020 | — Data not available | No result reported |
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2019-20 | ≥ 6,000 | 2020 | — Data not available | No result reported |
Current: the 2026-27 plan's targets
No indicators in the 2026-27 plan.
Future goals: targets due after 2026-27
No targets with a later due date.
Spending and employees: planned against actual
Spending
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2018-19 | $105M | $53.6M |
| 2019-20 | $48.6M | $45.5M |
| 2020-21 | $44.8M | $60.3M |
| 2021-22 | $50.8M* | — |
| 2022-23 | $81.3M* | — |
Employees (FTEs)
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2018-19 | 3 | 3 |
| 2019-20 | 4 | 3 |
| 2020-21 | 3 | 3 |
| 2021-22 | 3* | — |
| 2022-23 | 3* | — |
Planned spending, plan by plan
Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans
| Plan | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 |
|---|---|---|---|---|---|
| 2018-19 plan | $105,426,739 | $48,745,452 | $44,454,243 | ||
| 2019-20 plan | $48,620,740 | $44,278,305 | $50,509,655 | ||
| 2020-21 plan | $44,790,805 | $50,772,762 | $81,335,317 | ||
| Actual | $53,565,300 | $45,463,374 | $60,324,462 |
Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.