Canada Spends Logo

Explore our Budget 2026 analysis

Program directory · Housing, Infrastructure and Communities Canada

Toronto Waterfront Revitalization Initiative

Program code
BTK10 (OICC)
Core responsibility
Public Infrastructure
In Departmental Plans
2018-19 – 2020-21 · Appeared and later dropped

What it does

Investments through the Toronto Waterfront Revitalization Initiative will provide flood protection to southeastern portions of downtown Toronto, including parts of the port lands, South Riverdale, Leslieville, south of Eastern Avenue, and the First Gulf/Unilever development site. The Toronto Waterfront Revitalization Initiative terms and conditions are scheduled to expire in 2024. Through the Toronto Waterfront Revitalization Initiative, approximately 240 hectares of land will be protected from flooding, and approximately 73 hectares of brownfields will be remediated. Additionally, over 36 hectares of green space will be available for public use. Funding provided through the Toronto Waterfront Revitalization Initiative will also effectively upgrade municipal infrastructure in the area making improvements to roads, bridges, and water and wastewater systems. In the long-term, Toronto Waterfront Revitalization Initiative funding will provide opportunities for residential and commercial development, access to affordable housing, and public transit.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-23Toronto Waterfront Revitalization Initiative 2018-19: $53.6MToronto Waterfront Revitalization Initiative 2019-20: $45.5MToronto Waterfront Revitalization Initiative 2020-21: $60.3MToronto Waterfront Revitalization Initiative 2021-22: $50.8MToronto Waterfront Revitalization Initiative 2022-23: $81.3MToronto Waterfront Revitalization Initiative
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data.
ProgramRelationYears with dataActual spending over those years
Toronto Waterfront Revitalization InitiativeThis program2018-19 – 2022-23$159M

No earlier or later program in the same department has a similar name.

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2020-21Indicators dropped: Number of hectares of habitat restoration; Number of hectares of land protected from flooding; Number of hectares of remediated brownfield; Number of linear metres (lm) of storm sewer added; Number of metres of new river channel added; Number of metres of protected shoreline; Number of metres of road added; Number of new bridgesDepartmental Results Framework (GC InfoBase)
2020-21Spending $60.3M, against $45.5M in 2019-20 (+33%).Actual spending (GC InfoBase)
2022-23Planned spending $81.3M, against $50.8M in 2021-22 (+60%).Latest Departmental Plan
2025Budget 2025 measure “Supporting Housing Enabling Infrastructure and Flood Protection near Toronto's Waterfront”: $0M in total over its years (linked to this program by name, a best-effort match).Budget 2025, PDF page 279

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

Percent reduction in soil contaminants
Expected result: Investments contribute to the remediation of underdeveloped brownfields
90%2019-20– no result

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2019-20≥ 90%2020—
Data not available
No result reported
Number of hectares of land protected from flooding
Expected result: Investments contribute to enhanced flood protection
2402019-20– no result

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2019-20≥ 2402020—
Data not available
No result reported
Number of hectares of remediated brownfield
Expected result: Investments contribute to the remediation of underdeveloped brownfields
732019-20– no result

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2019-20≥ 732020—
Data not available
No result reported
Number of metres of protected shoreline
Expected result: Investments contribute to enhanced flood protection
6,0002019-20– no result

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2019-20≥ 6,0002020—
Data not available
No result reported

Current: the 2026-27 plan's targets

No indicators in the 2026-27 plan.

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $105M2018-19: $53.6M2018-192019-20: $48.6M2019-20: $45.5M2019-202020-21: $44.8M2020-21: $60.3M2020-212021-22: $50.8M2021-222022-23: $81.3M2022-23
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$105M$53.6M
2019-20$48.6M$45.5M
2020-21$44.8M$60.3M
2021-22$50.8M*—
2022-23$81.3M*—

Employees (FTEs)

2018-19: 32018-19: 32018-192019-20: 42019-20: 32019-202020-21: 32020-21: 32020-212021-22: 32021-222022-23: 32022-23
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-1933
2019-2043
2020-2133
2021-223*—
2022-233*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.