Canada Spends Logo

Explore our Budget 2026 analysis

Program directory · Transport Canada

Transportation Innovation

Program code
BTX04 (TC)
Core responsibility
Green and Innovative Transportation System
In Departmental Plans
2018-19 – 2026-27 · New since an earlier plan

What it does

Our Program supports Transport Canada’s multi-modal safety oversight of new and emerging transportation technologies through risk assessments, safety testing and targeted research. Research outcomes identify risks and mitigations to ensure new technologies can be integrated into the Canadian transportation system in a safe and timely manner. The Program also operates TC’s world-class Motor Vehicle Test Centre.

The program supports regulatory and policy initiatives across all modes of transportation, including: conducting aircraft de-icing research to support safe civil aviation; performing vehicle compliance and crashworthiness testing at our Motor Vehicle Test Centre to advance occupant protection; testing advanced driver assistance features to enhance pedestrian safety; and testing new rail inspection technologies to improve safety. Our research is essential in ensuring the department develops and implements informed policy and regulations across all transportation modes.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-232023-242024-252025-262026-272027-282028-29Transportation Innovation 2018-19: $18.3MTransportation Innovation 2019-20: $27.9MTransportation Innovation 2020-21: $31.9MTransportation Innovation 2021-22: $25.8MTransportation Innovation 2022-23: $30.5MTransportation Innovation 2023-24: $37.3MTransportation Innovation 2024-25: $52.7MTransportation Innovation 2025-26: $30.7MTransportation Innovation 2026-27: $17.6MTransportation Innovation 2027-28: $14.3MTransportation Innovation 2028-29: $13.9MTransportation Innovation
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data.
ProgramRelationYears with dataActual spending over those years
Transportation InnovationThis program2018-19 – 2028-29$224M

No earlier or later program in the same department has a similar name.

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2019-20Spending $27.9M, against $18.3M in 2018-19 (+52%).Actual spending (GC InfoBase)
2021-22Indicators added: Number of funded projects, evaluations, studies and analysis of new and emerging transportation technologies which provide evidence to support policy and regulatory decision makingDepartmental Results Framework (GC InfoBase)
2021-22Indicators dropped: Number of Connected Vehicle/Automated Vehicle/Remotely Piloted Aerial Systems deployments in CanadaDepartmental Results Framework (GC InfoBase)
2023Budget 2023 measure “Supporting Advanced Transportation Technologies”: $139M in total over its years (linked to this program by name, a best-effort match).Budget 2023, PDF page 128
2024-25Spending $52.7M, against $37.3M in 2023-24 (+41%).Actual spending (GC InfoBase)
2025-26Planned spending $30.7M, against $52.7M in 2024-25 (−42%).Latest Departmental Plan
2026-27Planned spending $17.6M, against $30.7M in 2025-26 (−43%).Latest Departmental Plan

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

Number of funded projects, evaluations, studies and analysis of new and emerging transportation technologies which provide evidence to support policy and regulatory decision making
Expected result: A transportation system that supports innovation
342021-22✓ met342022-23✓ met332023-24✓ met352024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2021-22—202234
The target should have been at least 30, which was achieved.
Met
2022-23≥ 30202334
We completed more projects than originally anticipated due to securing more funding for Innovation/Experimentation Projects.
Met
2023-24≥ 30202433Met
2024-25≥ 30202535Met
Number of Connected Vehicle/Automated Vehicle/Remotely Piloted Aerial Systems deployments in Canada
Expected result: A transportation system that supports innovation
302020-21– no result

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2020-21The target and the date to achieve the target are currently under development202230
In 2020 to 2021, Transport Canada’s Innovation transportation supported 30 projects to advance New and Emerging Transportation Technologies which provide evidence to support policy and regulatory decision making. This number is based on the number of funded projects, theme projects, evaluations, studies and policy research contracts that we completed in 2020-21.
No result reported

Current: the 2026-27 plan's targets

Number of funded projects, evaluations, studies and analysis of new and emerging transportation technologies which provide evidence to support policy and regulatory decision making
Expected result: A transportation system that supports innovation
302026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 302027—Planned

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $2.5M2018-19: $18.3M2018-192019-20: $18.3M2019-20: $27.9M2019-202020-21: $20.9M2020-21: $31.9M2020-212021-22: $15.8M2021-22: $25.8M2021-222022-23: $16.6M2022-23: $30.5M2022-232023-24: $17.9M2023-24: $37.3M2023-242024-25: $24.1M2024-25: $52.7M2024-252025-26: $30.7M2025-262026-27: $17.6M2026-272027-28: $14.3M2027-282028-29: $13.9M2028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$2.5M$18.3M
2019-20$18.3M$27.9M
2020-21$20.9M$31.9M
2021-22$15.8M$25.8M
2022-23$16.6M$30.5M
2023-24$17.9M$37.3M
2024-25$24.1M$52.7M
2025-26$30.7M—
2026-27$17.6M—
2027-28$14.3M*—
2028-29$13.9M*—

Employees (FTEs)

2018-19: 152018-19: 392018-192019-20: 492019-20: 502019-202020-21: 432020-21: 482020-212021-22: 442021-22: 472021-222022-23: 382022-23: 512022-232023-24: 482023-24: 532023-242024-25: 512024-25: 542024-252025-26: 442025-262026-27: 312026-272027-28: 302027-282028-29: 292028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-191539
2019-204950
2020-214348
2021-224447
2022-233851
2023-244853
2024-255154
2025-2644—
2026-2731—
2027-2830*—
2028-2929*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.