Program directory · Transport Canada

National Trade Corridors

Program code
BTY04 (TC)
Core responsibility
Efficient Transportation System
In Departmental Plans
2018-19 – 2026-27 · New since an earlier plan

What it does

Our Program supports efficient market access for products through investment in Canada's trade corridors. Through the management of infrastructure funds, and the use of policy based measures, the Program is responsible for providing funding to help infrastructure owners and users invest in strategic projects.

Projects funded under our Program: serve to increase and diversify the flow of Canadian trade around the world and the interconnectivity between trade infrastructure; support the flow of goods and passengers by reducing bottlenecks, and address capacity issues; help the transportation system withstand the effects of climate change and ensure it is able to support new technologies and innovation; address the unique transportation needs in Canada's territorial North to improve safety and foster economic and social development; and build on investments made by a variety of public and private sector partners.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-232023-242024-252025-262026-272027-282028-29National Trade Corridors 2018-19: $54.9MNational Trade Corridors 2019-20: $102MNational Trade Corridors 2020-21: $193MNational Trade Corridors 2021-22: $261MNational Trade Corridors 2022-23: $240MNational Trade Corridors 2023-24: $484MNational Trade Corridors 2024-25: $556MNational Trade Corridors 2025-26: $833MNational Trade Corridors 2026-27: $1.49BNational Trade Corridors 2027-28: $2.03BNational Trade Corridors 2028-29: $1.32BNational Trade Corridors
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data.
ProgramRelationYears with dataActual spending over those years
National Trade CorridorsThis program2018-19 – 2028-29$1.89B

No earlier or later program in the same department has a similar name.

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2019-20Indicators added: Number of transportation projects completed (with target being 100% of projects announced by 2028)Departmental Results Framework (GC InfoBase)
2019-20Indicators dropped: Number of transportation projects completedDepartmental Results Framework (GC InfoBase)
2019-20Spending $102M, against $54.9M in 2018-19 (+86%).Actual spending (GC InfoBase)
2020-21Spending $193M, against $102M in 2019-20 (+89%).Actual spending (GC InfoBase)
2021-22Indicators added: Percentage of transportation projects completed on budget; Percentage of transportation projects completed on timeDepartmental Results Framework (GC InfoBase)
2021-22Indicators dropped: Capacity added to the transportation system measured at the project level as a percentage increase from existing capacity; Dollar value of federal funding invested; Number of transportation projects completed (with target being 100% of projects announced by 2028)Departmental Results Framework (GC InfoBase)
2021-22Spending $261M, against $193M in 2020-21 (+35%).Actual spending (GC InfoBase)
2022-23Employees (FTEs) 111, against 67 in 2021-22 (+66%).FTEs (GC InfoBase)
2022-23Indicators added: Percentage of funding committed from the funding envelope to meritorious projects; Value of funding leveraged, as a percentage, from each departmental dollar investedDepartmental Results Framework (GC InfoBase)
2022-23Indicators dropped: Percentage of transportation projects completed on budget; Percentage of transportation projects completed on timeDepartmental Results Framework (GC InfoBase)
2023-24Spending $484M, against $240M in 2022-23 (+102%).Actual spending (GC InfoBase)
2025-26Planned employees (FTEs) 40, against 88 in 2024-25 (−55%).FTEs (GC InfoBase)
2025-26Planned spending $833M, against $556M in 2024-25 (+50%).Latest Departmental Plan
2026-27Planned employees (FTEs) 121, against 40 in 2025-26 (+203%).FTEs (GC InfoBase)
2026-27Planned spending $1.49B, against $833M in 2025-26 (+79%).Latest Departmental Plan
2027-28Planned spending $2.03B, against $1.49B in 2026-27 (+37%).Latest Departmental Plan
2028-29Planned spending $1.32B, against $2.03B in 2027-28 (−35%).Latest Departmental Plan

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

Percentage of funding committed from the funding envelope to meritorious projects
Expected result: Program design and implementation efficiently attracts, selects and funds meritorious projects that address the investment priorities identified by TC
80%2022-23✓ met98.9%2023-24✓ met98.5%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2022-23≥ 25%202280%
$3,683,395,339 of formal commitments and expenditures over a total budget of $4,599,036,898 is 80%. The result is significantly higher than the target, as the program did not receive additional contribution funding through Budget 2023.
Met
2023-24≥ 50%202498.9%
98.9% of NTCF funding has been committed to meritorious projects.
Met
2024-25≥ 75%202598.5%Met
Value of funding leveraged, as a percentage, from each departmental dollar invested
Expected result: Grants and Contributions Programs - Cost barrier to implement projects that strengthen the efficiency and resilience of Canada’s trade corridors, is reduced
102%2022-23✗ not met259%2023-24✗ not met157%2024-25✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2022-23100% – 100%2023102%
The terms and conditions of the program do not allow for the result to be below 100%, with the exception of projects in the Arctic and North. As such, this result excludes the Arctic and North projects, as they target a result of at least 25%. The result when including the Arctic and North projects for the 2022-23 FY is 63%.
Not met
2023-24100% – 100%2024259%
NTCF investments of $4.1B have resulted in total investments of $10.6B, or 259% from each departmental dollar invested.
Not met
2024-25≥ 100%2025157%
Target met. Note: the year-end result for 23-24 was overstated at 259% as it included federal investments; the correct value is 159%. Understanding this, the difference between 23-24 and 24-25 is 2%, a reasonable year to year variation.
Met
Percentage of transportation projects completed on budget
Expected result: Grant and contribution Programs - Projects are implemented effectively and efficiently
94%2021-22✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2021-22≥ 90%202294%Met
Percentage of transportation projects completed on time
Expected result: Projects are implemented effectively and efficiently
31%2021-22✗ not met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2021-2275% – 75%202231%
In the FY 2021-22, five of the 16 projects (31%) were completed on time. Of the 11 projects not completed on time: - Eight projects (73%) cited COVID-19-related challenges (restrictions, impacts on labour force and supply chains). - Six projects (55%) cited non-COVID-19 reasons, such as unfavourable weather, additional cleanup work, unanticipated asbestos. - Five projects (45%) were completed wit…
Not met
Capacity added to the transportation system measured at the project level as a percentage increase from existing capacity
Expected result: Capacity of national trade corridors has been enhanced
Report yearTargetDueResultStatus
2018-19The target and the date to achieve the target are currently under development2019—
No actual result available
No result reported
2019-20—2020—
In 2019-20, 4 projects were completed. However, since the projects were of different nature (e.g., air vs. road) it is not possible to report one number as a measure of improvement.
No result reported
2020-21The target and the date to achieve the target are currently under development2021—
There are no results to report for 2020-21 as the indicator is under review and will be replaced by an indicator that is more practical and measurable. The original indicator was meant to measure the increase in the capacity of a given trade corridor on a project by project basis. However, out of 105 projects approved under the NTCF to date, approximately 60 are underway and only 9 are completed,…
No result reported
Dollar value of federal funding invested
Expected result: Trade and Transportation Infrastructure Investments
$352018-19✗ not met$972019-20✗ not met$163M2020-21✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2018-19≥ $1002019$35
The program spent $24.6 M in grants and contributions in 2018-19; this represents 35% of the $71.2 M forecasted in grants and contributions for this fiscal year. The target was not met due to a number of factors, namely: • Delays in signing the contribution agreements with recipients; • Delays in the projects due to factors such as weather conditions, contractor and/or material availability, and…
Not met
2019-20≥ $1002020$97
The goal is to invest the full amount of Treasury Board's annual allocations by 2028. In 2019-20 we committed $1.75 billion of the available $1.8 billion resulting in a 97% target acheivement
Not met
2020-21≥ $50M2021$163M
Over the course of fiscal year 2020-21, $163M in grants and contribution funding was committed to projects under the NTCF program.
Met

Current: the 2026-27 plan's targets

Percentage of funding committed from the funding envelope to meritorious projects
Expected result: Program design and implementation efficiently attracts, selects and funds meritorious projects that address the investment priorities identified by TC
75%2026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 75%2027—Planned
Value of funding leveraged, as a percentage, from each departmental dollar invested
Expected result: Grants and Contributions Programs - Cost barrier to implement projects that strengthen the efficiency and resilience of Canada’s trade corridors, is reduced
100%2026-27

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2026-27≥ 100%2027—Planned

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $198M2018-19: $54.9M2018-192019-20: $339M2019-20: $102M2019-202020-21: $495M2020-21: $193M2020-212021-22: $422M2021-22: $261M2021-222022-23: $1.12B2022-23: $240M2022-232023-24: $922M2023-24: $484M2023-242024-25: $890M2024-25: $556M2024-252025-26: $833M2025-262026-27: $1.49B2026-272027-28: $2.03B2027-282028-29: $1.32B2028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$198M$54.9M
2019-20$339M$102M
2020-21$495M$193M
2021-22$422M$261M
2022-23$1.12B$240M
2023-24$922M$484M
2024-25$890M$556M
2025-26$833M—
2026-27$1.49B—
2027-28$2.03B*—
2028-29$1.32B*—

Employees (FTEs)

2018-19: 352018-19: 372018-192019-20: 452019-20: 442019-202020-21: 482020-21: 502020-212021-22: 552021-22: 672021-222022-23: 1182022-23: 1112022-232023-24: 1232023-24: 1092023-242024-25: 1082024-25: 882024-252025-26: 402025-262026-27: 1212026-272027-28: 1192027-282028-29: 1072028-29
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-193537
2019-204544
2020-214850
2021-225567
2022-23118111
2023-24123109
2024-2510888
2025-2640—
2026-27121—
2027-28119*—
2028-29107*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.