Program directory · Canada Energy Regulator
Management System and Industry Performance
- Department
- Canada Energy Regulator
- Program code
- BTB02 (NEB)
- Core responsibility
- Safety and Environment Oversight
- In Departmental Plans
- 2018-19 – 2018-19 · Appeared and later dropped
What it does
GC InfoBase has no Program Inventory description for this program.
History and lineage
First appears in GC InfoBase's actual spending by program in 2017-18. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).
| Program | Relation | Years with data | Actual spending over those years |
|---|---|---|---|
| Management System and Industry Performance | This program | 2017-18 – 2020-21 | $751K |
| Industry Performance | Later program (name match, medium confidence) | 2019-20 – 2028-29 | $25.1M |
Significant changes in scope and budget
Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.
| Year | What changed | Source |
|---|---|---|
| 2019-20 | Appears to be replaced by Industry Performance | Canada Spends name match across plans (an inference) |
Success criteria
The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.
Historical: targets against results
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2018-19 | ≥ 100% | 2019 | 100% | Met |
Bars: result reported. Dashed line: target.
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2018-19 | ≥ 50% | 2019 | 12% The data underlying the relatively new focused audit protocol is still being developed. Because of the very nature of “focused” audits we are getting repeats by design and it doesn’t really tell us “repeat” so much as it tells us where to issue an Information Advisory. In order to be repeat, companies would need to be given the opportunity to know about the correct finding(s) which is not possibl… | Not met |
| Report year | Target | Due | Result | Status |
|---|---|---|---|---|
| 2018-19 | Downward trend | 2019 | Downward trend | Met |
Current: the 2026-27 plan's targets
No indicators in the 2026-27 plan.
Future goals: targets due after 2026-27
No targets with a later due date.
Spending and employees: planned against actual
Spending
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2017-18 | — | $429K |
| 2018-19 | $3.9M | $321K |
| 2019-20 | $3.9M* | — |
| 2020-21 | $1.4M* | — |
Employees (FTEs)
Show the numbers
| Fiscal year | Planned | Actual |
|---|---|---|
| 2017-18 | 23 | 17 |
| 2018-19 | 24 | 18 |
| 2019-20 | 24* | — |
| 2020-21 | 8* | — |
Planned spending, plan by plan
Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans
| Plan | 2018-19 | 2019-20 | 2020-21 |
|---|---|---|---|
| 2018-19 plan | $3,904,524 | $3,904,524 | $1,426,839 |
| Actual | $321,339 |
Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.