Canada Spends Logo

Explore our Budget 2026 analysis

Program directory · Transport Canada

Navigation Protection Program

Program code
BTW12 (TC)
Core responsibility
Safe and Secure Transportation System
In Departmental Plans
2018-19 – 2020-21 · Appeared and later dropped

What it does

Our Program is tasked with administering and enforcing the Navigation Protection Act, including: authorizing ‘works’ (i.e., any human-made structure, device or thing) on Canada’s navigable waterways; and managing obstructions and enforcing prohibitions (i.e., depositing, throwing and dewatering (the removal of water)). Our Program also administers and enforces parts of the Canada Shipping Act, 2001, including: receiver of Wreck Program as a custodian of a wreck; and Private Buoy Regulations for privately owned floating information markers (e.g., for speed limits). We also have responsibilities under the Ferry Cable Regulations, Navigable Waters Bridges Regulations and the Navigable Waters Works Regulations. Our Program serves many different clients, such as: Canada’s industrial (e.g., mining), tourism and recreation sectors; the general public, including private property owners; and provincial, territorial and municipal governments and other federal government departments.

Source: the department's Program Inventory, via GC InfoBase.

History and lineage

First appears in GC InfoBase's actual spending by program in 2018-19. The data does not record when a program was created; it may be older than its first appearance here, which is limited by the sources (program spending starts in 2010-11, Departmental Plans in 2018-19).

2018-192019-202020-212021-222022-232023-242024-252025-262026-272027-282028-29Navigation Protection Program 2018-19: $8.9MNavigation Protection Program 2019-20: $9.7MNavigation Protection Program 2020-21: $12.3MNavigation Protection Program 2021-22: $12MNavigation Protection Program 2022-23: $13.5MNavigation Protection Program 2021-22: $10.6MNavigation Protection Program 2022-23: $11.4MNavigation Protection Program 2023-24: $12.1MNavigation Protection Program 2024-25: $11.9MNavigation Protection Program 2025-26: $14.8MNavigation Protection Program 2026-27: $14.8MNavigation Protection Program 2027-28: $13.9MNavigation Protection Program 2028-29: $12.8MNavigation Protection ProgramNavigation Protection Program
Bars: spending by fiscal year (dark: actual; light: actual restated on the 2017-18 program structure; outlined: the latest plan's forecast; grey: related programs). Bands: each program in the lineage over the years it has data.
ProgramRelationYears with dataActual spending over those years
Navigation Protection ProgramThis program2018-19 – 2022-23$31M
Navigation Protection ProgramLater program (name match, high confidence)2021-22 – 2028-29$46M

Significant changes in scope and budget

Detected from the data: renames between plans, programs it appears to replace, merge with or split into (matched by name), year-over-year changes in spending of at least 25% and $5M, or in employees of at least 20% and 25 FTEs, linked budget measures, and results indicators added or dropped.

YearWhat changedSource
2020-21Indicators added: The percentage of works (e.g. dams and bridges) for which a decision has been taken within the established service standards, excluding time for Environmental Assessments and Aboriginal Consultations.Departmental Results Framework (GC InfoBase)
2020-21Indicators dropped: The percentage of works (works are water related stuctures such as marinas, bridges, and dams) authorized within xx (TBD) days under normal circumstances (excludes time for Environmental Assessments and Aboriginal Consultations).Departmental Results Framework (GC InfoBase)
2021-22Appears to be replaced by Navigation Protection ProgramCanada Spends name match across plans (an inference)

Success criteria

The program's indicators from its department's Departmental Results Framework: the target set in each year's plan, and the result reported the following year. Source: GC InfoBase.

Historical: targets against results

The percentage of works (e.g. dams and bridges) for which a decision has been taken within the established service standards, excluding time for Environmental Assessments and Aboriginal Consultations.
Expected result: Authorizations issued are timely
77%2020-21✗ not met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2020-21≥ 80%202177%
A change to the methodology was submitted but will not be reflected in the 2020-2021 results. The percentage is slightly lower than the minimum target because, in the new IT systems, the new functionality to 'pause' a submission when it is out for consultation or awaiting proponent's action was only introduced in December 2020. As a result, for many submissions, the clock didn't stop when NPP was…
Not met
The percentage of works (works are water related stuctures such as marinas, bridges, and dams) authorized within xx (TBD) days under normal circumstances (excludes time for Environmental Assessments and Aboriginal Consultations).
Expected result: Authorizations issued are timely
100%2019-20✓ met

Bars: result reported. Dashed line: target.

Report yearTargetDueResultStatus
2019-20≥ 80%2020100%Met

Current: the 2026-27 plan's targets

No indicators in the 2026-27 plan.

Future goals: targets due after 2026-27

No targets with a later due date.

Spending and employees: planned against actual

Spending

2018-19: $5.3M2018-19: $8.9M2018-192019-20: $11.3M2019-20: $9.7M2019-202020-21: $11.9M2020-21: $12.3M2020-212021-22: $12M2021-222022-23: $13.5M2022-23
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-19$5.3M$8.9M
2019-20$11.3M$9.7M
2020-21$11.9M$12.3M
2021-22$12M*—
2022-23$13.5M*—

Employees (FTEs)

2018-19: 422018-19: 552018-192019-20: 832019-20: 752019-202020-21: 782020-21: 842020-212021-22: 782021-222022-23: 912022-23
Outlined bar: planned in that year's Departmental Plan (dashed: the latest plan, for years not yet reported). Filled bar: actual.
Show the numbers
Fiscal yearPlannedActual
2018-194255
2019-208375
2020-217884
2021-2278*—
2022-2391*—

Planned spending, plan by plan

Each row is one year's Departmental Plan and its forecast for the next three fiscal years; read a column down to see how the forecast for one year changed. The last row is what was actually spent. Click an amount for its source. Biggest changes in federal spending plans

Actual spending is from Departmental Results Reports and the Public Accounts, as published in GC InfoBase. FTEs are full-time equivalents.